How to Keep One Calendar of Certificate Dates Without Losing the Folder
Build one row per certificate: property, type, issue, next due, PDF path, proof-of-send. Colour 90/30/7 as a habit. Keep voids on. One folder per address.
Rental operations notes from the IziRento team. Not legal advice.
Key takeaways
A landlord compliance calendar for certificate expiry dates UK is one row per document, not one cell per house. Write six columns: property, type, issue date, next due, where the PDF lives, and proof-of-send. Colour 90, 30 and 7 days as a booking habit, not a regulation. Pair every date with one address folder so a red cell opens a path. Review empty lets on the same monthly pass. Then stop.
Three dates in a phone calendar and the PDF still in an engineer’s email is the usual mess. One spreadsheet row per document — property, type, issue, next due, PDF path, proof-of-send — plus one folder per address so a red date opens a file. Build the six columns, colour 90 / 30 / 7 as a habit, keep voids on the sheet, and stop.
Sunday. Beth’s two lets in Nottingham. The phone says “gas — 12 Oak” in 11 days. The PDF is in last October’s engineer email; last year’s paper is in a drawer. The EICR — Electrical Installation Condition Report — on the empty terrace is off the sheet “because nobody is in”. In practice a six-column row, a 90 / 30 / 7 colour, and a folder named 12-Oak-Street would have been the file.
A date without a path is not a file. HSE’s landlord gas FAQ (checked 12 September 2026): you may check up to two months early and keep the anniversary; there is no grace after expiry. An empty let does not pause the sheet. Typical mistake: treating leftover days on an old CP12 as carry-over.
Disclaimer: IziRento is operations software, not legal advice. Local tenancy rules vary; check a qualified adviser for binding decisions.
What does one row per document need in six columns?
One row per document, not one “property due” cell. The six columns are property, type, issue date, next due, where the PDF lives, and proof-of-send. Gas, EICR, EPC, a smoke and CO log and a legionella next-review cannot share one cell. Copy next due off the document.
Do write those six. Do not add Right to Rent, a deposit scheme or How to Rent as the spine. For example, Beth needed a gas row for 12 Oak and a separate EICR row for the empty terrace.
Type is the document, not the house. CP12 is the Landlord Gas Safety Record — twelve months. The EICR is at least every five years, and GOV.UK electrical-safety guidance (1 November 2025) says the report sets the next date — use any earlier printed date. An EPC — energy certificate — lasts ten years once lodged, per the GOV.UK dwellings guide. Smoke and CO are a day-one log; legionella is a next-review date. HSE’s landlord legionella page says there is no test certificate and no annual statute clock.
Proof-of-send is a path: sent email, signed receipt, or “not sent yet”. The 28-day clocks live on the CP12 file and the EICR file. A new tenant gets those copies before they occupy, plus a copy of the lodged EPC. This card only stores where that proof lives.
One row per document
| Property | Type | Issue | Next due | PDF path | Proof-of-send |
|---|---|---|---|---|---|
| 12 Oak | CP12 | 2025-10-12 | 2026-10-12 | Drive/12-Oak-Street/CURRENT/CP12-2026-10-12.pdf | Sent 2025-10-14 |
| 8 Elm (void) | EICR | 2022-11-03 | 2027-11-03 | Drive/8-Elm-Terrace/CURRENT/EICR-2027-11-03.pdf | not sent yet |
How do you traffic-light the next 90, 30 and 7 days?
The colours are a booking habit, not a statute. Reminder tools often fire at 90, 30 and 7 days; the regulations do not. At 90 days confirm the PDF path still opens. At 30 days book. At 7 days confirm the visit, or escalate. Red means overdue or the path is dead.
Do set the colours as a Sunday glance, not as law. Do not claim 90 / 30 / 7 sits in the regulations. For gas, 30 days sits inside the HSE two-month window, so September can stay September. Booking six months early can move the anniversary. There is no late grace.
Green is more than 90 days and a path that still opens. Amber at 90 is “look at the folder”. Pressure starts at 30: a name and a slot. A typical mistake is painting the house red because gas is due while the EPC has years left.
90 / 30 / 7 is a habit
| Colour | When | Do | Do not |
|---|---|---|---|
| Green | >90 days, path opens | Look again next month | Hide the row because empty |
| Amber 90 | Inside 90 days | Open the folder; confirm the PDF | Treat 90 as a legal deadline |
| Amber 30 | Inside 30 days | Book (gas: two-month window) | Book six months early |
| Amber 7 | Inside 7 days | Confirm the visit or escalate | Assume leftover days carry over |
| Red | Overdue or path dead | Book now; restore the file | Invent a grace period |
No grace after expiry
Leftover days on an old CP12 do not carry over. You may check up to two months early and keep the anniversary. After the due date there is no late window.

How do you pair the sheet with one folder per address?
One folder per address, not one giant “all gas certs” pile. Name it the address — 12-Oak-Street. Current PDFs in CURRENT, last year’s in ARCHIVE. Name files with type and expiry. Paste that path into “where the PDF lives”. A date without a path is a hunt.
Do paste a Drive, OneDrive, Dropbox or disk path. Do not leave the live file in email. For example: Drive/12-Oak-Street/CURRENT/CP12-expires-2026-10-12.pdf. The smoke and CO alarm test log and the legionella one-page record live in the same address folder. They still need a path.
Do file current plus the previous record in that address folder. Do not keep one portfolio-wide gas pile. A dead path is already red.

Do you pause the sheet when the let is empty?
No. Clocks do not pause for a void. A still-valid gas record can be copied to a new tenant; if it expired while empty, renew before they occupy. A still-valid EICR does not need a new test just to re-let — you still give a copy. Keep the row on the monthly pass.
Do start the Sunday pass with occupied and empty lets together. HSE’s “what if” gas page (checked 12 September 2026): the record is valid twelve months from the check; a new tenancy inside that period takes a copy. Hide the empty terrace and you find the expiry at keys-out. That was Beth’s problem on 8 Elm.
The monthly pass is short: open every amber and red row, click the PDF path, and check proof-of-send or leave “not sent yet”. Book if you are inside 30 days. If the void’s CP12 or EICR will expire before keys-out, book now. A long empty period can move the legionella next-review; it does not invent a two-year certificate.

When do you stop and leave each certificate file alone?
This card is a date-and-folder habit. It is not a landlord-software category page. Once the six columns exist, the colours are a glance, each date has a path, and the void is still on the Sunday list, you stop. The how-tos live next door.
Do not turn the sheet into a 2026 statute dump. Gas, EICR, EPC, alarms and legionella how-tos sit next door. Workflow: Build six columns → Colour 90 / 30 / 7 → Paste the folder path → Fill send-proof or “not sent yet” → Monthly void pass → Stop.
Success bar: open the sheet, click a red or amber path, and land on the current PDF plus send-proof or “not sent yet”, including the empty let, in a minute. Verify that checklist, then stop. An IziRento workspace can hold the property, a reminder and a path to the PDF. It does not certify the let.
Build the date sheet
One row per document
Six columns: property, type, issue, next due, PDF path, proof-of-send.
Copy next due off the document
EICR: printed next-inspection if earlier than five years. EPC: ten years. Gas: twelve months. Legionella: next review. Smoke/CO: day-one log.
Traffic-light 90 / 30 / 7
90 = confirm the path. 30 = book. 7 = confirm or escalate. Red = overdue or file missing.
One folder per address
Name it the address. CURRENT plus ARCHIVE. Paste the path. Do not leave the live PDF in email.
Fill proof-of-send or write “not sent yet”
Path to the sent email or signed receipt. Send clocks live on the gas, EICR and EPC files.
Review monthly, including voids
Same Sunday pass. Click amber and red. Book anything that expires before keys-out.
Stop
Do not rewrite the certificate how-tos. Do not write a software landing.
FAQ
What columns are the minimum?
Six: property, type, issue or check date, next due or next review, where the PDF lives, and proof-of-send. Dates without a path lose the folder.
Do I pause the sheet when the property is empty?
No. A gas record still inside 12 months can be copied to the new tenant; if it expired while empty, renew before they occupy. A still-valid EICR still needs a copy, not a new test. Keep the row.
How do I treat a report that sets an earlier next-inspection date?
Use the earlier date. Five years is the ceiling, not inspection-plus-five. Remedial pack: https://izirento.com/en-gb/blog/eicr-electrical-safety-report-file
Is the 90 / 30 / 7 traffic-light a legal deadline?
No. It is a booking habit. The regulations do not set 90, 30 or 7. There is no grace after a gas expiry.
Do I put a legionella or smoke-alarm certificate expiry on this sheet?
No. Next-review plus the one-page record, not a test certificate: https://izirento.com/en-gb/blog/legionella-risk-assessment-record Smoke and CO are a day-one log: https://izirento.com/en-gb/blog/smoke-co-alarm-test-log
Does this calendar replace the gas, EICR or EPC file guides?
No. Dates and paths only. CP12 https://izirento.com/en-gb/blog/gas-safety-certificate-cp12-file · EICR https://izirento.com/en-gb/blog/eicr-electrical-safety-report-file · EPC https://izirento.com/en-gb/blog/epc-rental-get-and-keep This card is England; other nations differ.
Keep the date row with the property
Hold the reminder and a path to the PDF. The workspace does not certify the let.
Try the workspaceBuild one row per certificate: property, type, issue, next due, PDF path, proof-of-send. Colour 90/30/7 as a habit. Keep voids on. One folder per address.
Sources
- HSE — Landlords: gas safety FAQ
- HSE — Gas safety check records
- HSE — Gas safety checks: what if
- GOV.UK — Electrical safety standards (published 1 November 2025)
- GOV.UK — Energy performance certificates for dwellings
- HSE — Legionella: landlords’ responsibilities
- GOV.UK — Smoke and carbon monoxide alarm Q&A
Next steps
Related articles

How to Assemble Material Information for a Rental Listing Before It Goes Live

What Rent You Can Take Before Move-In — After the Agreement Is Signed

How to Advertise One Asking Rent and File the Decline of Any Bid Above It

How to File a Mutual Surrender When a Tenant Wants to Leave Before Notice Runs

How Long to Keep Tenant Records After a Tenancy — A Schedule You Can Run

Tenant Swap in a Shared House: File the Named-Tenant Change Without Crossing Out a Name
This material is for information only and is not legal advice.